Earthwork
Cubic Yard Calculator
Convert excavation dimensions into cubic yards, cubic meters, and cubic feet for fast removal estimates.
Open calculatorEstimate both the compacted volume required in place and the loose volume that may need to be ordered from a supplier.

Material planning
Estimate both the compacted volume required in place and the loose volume that may need to be ordered from a supplier.
Compacted volume
33.33 yd³
Required in place
Loose order volume
37.33 yd³
Includes 12.00% allowance
Metric equivalent
28.54 m³
Useful for supplier quotes
Field guidance 1
Loose order volume should account for compaction and practical field waste.
Field guidance 2
Confirm whether the supplier quotes by loose cubic yard or compacted in-place measure.
Field guidance 3
Add density separately if you later convert this estimate into tonnage.
Related tools
Most sitework estimates continue into hauling, budget, or material planning. Use the related tools below to move from one decision to the next without starting over elsewhere.
Earthwork
Convert excavation dimensions into cubic yards, cubic meters, and cubic feet for fast removal estimates.
Open calculatorEarthwork
Estimate material removed from high zones and material required to build low zones on grading work.
Open calculatorEarthwork
Calculate trench volume, side-slope impact, and approximate truckloads for narrow deep excavations.
Open calculator